PVC Reinforced Pipe
PVC Reinforced Pipe
PVC Reinforced Pipe
PVC Reinforced Pipe

PVC Reinforced Pipe

PVC reinforced pipe is a novel pipe made of hard polyvinyl chloride as the main raw material and produced by one-time extrusion molding by an extruder with smooth inner wall and vertical reinforcement on the outer wall. The structure is reasonable and the strength is high.

  • 产品详情:

Performance characteristics

The strength and stiffness can withstand the load capacity in the geographical environment; the hydraulic characteristics are suitable for the ability to transport liquids; it does not leak, prevents environmental pollution, wear resistance, anti-wear, and is easy to lay and install. It has comprehensive economy; the design service life is 50 years.


Application area

1. Municipal sewage and drainage pipe system and external sewage and drainage pipe system of buildings.

2. Sewage treatment plant pipe system.

3. High-grade highway drainage pipeline system.

4. Agricultural water conservancy irrigation, water transmission, and drainage pipeline systems.

5. Pipeline systems used for special fluid transportation and discharge in chemical, mining and other industries.

6. Buried cables and post and telecommunications cable sheaths.


Installation and use

1. When the pipes are transported to the site for unloading, they should be lightly lifted and placed, neatly stacked, and the sockets and sockets should be stacked staggered in layers. The bottom straight pipe part should be covered with wooden backing. When stacking in the open air, it must be covered to prevent exposure to the sun and keep away from heat sources.

2. Before the pipe is used and installed, it should be carefully checked for damage during the loading, unloading, transportation and stacking process. If defective pipes such as damaged cracks and deformation are found, they should be removed in time.

3. The connection between the inspection well and the pipeline should be made of flexible joints sealed with flexible fillers. The specific structure shall be carried out according to the design requirements.

4. Attention should be paid to digging trenches and laying foundations:

◎Drainage measures should be taken during the excavation of the trench to prevent the bottom of the trench from being soaked by water. The foundation should be compacted and the surface should be flat.

◎Grooves should be reserved for the interface part of the pipeline foundation for interface operation.

5. Interface operation:

◎The inner and outer surfaces of the socket socket and the rubber ring should be cleaned before the interface.

◎The installation position of the rubber ring should be in the groove between the second and third ripples of the socket.


产品询盘

  • captcha